XII.3 The Bureau noted that a joint UNESCO-UNEP-RARE Center for Tropical Conservation mission to the site was fielded, from 23 January to 5 February 2002, as part of the implementation of the UNF-financed project: “Linking Biodiversity Conservation and Sustainable Tourism at World Heritage sites”. The State Party informed the Centre that co-operation between Park staff, the Navy and the police has been strengthened considerably and joint patrols are being undertaken. These patrols are likely to help curtail the illegal entry of fishermen from ...
Sites: Komodo National Park
XII.6 The Bureau noted that the Department of National Parks and Wildlife Conservation (DNPWC) of Nepal, via a letter dated 22 January 2002, informed the Centre that the Bureau’s concerns with the construction of the 33kv transmission lines between Jagatpur and Madi. This concern had been brought to the attention of the Ministry of Population and Environment, that is responsible for review and approval of the EIA for the project. IUCN has informed the Centre that this EIA is awaiting approval and notes that there is considerable public pressure in ...
Sites: Chitwan National Park
XII.11 The Bureau noted that an international expert meeting on the application of the World Heritage Convention in tropical coastal, marine and small-island ecosystems, jointly organized by the Centre and IUCN, was convened in Hanoi and Ha Long Bay from 23 February to 1 March 2002. A Centre staff, as well as several IUCN experts, attended the Workshop and are expected to report back on issues raised by the 25th extraordinary session of the Bureau in December 2001. The report requested from the State Party by the 25th extraordinary session of the Bureau has not been ...
Sites: Ha Long Bay
XII.14 As requested by the 25th session of the World Heritage Committee and its Bureau, a joint UNESCO/IUCN monitoring mission was undertaken to the site from 11 to 16 February 2002. The Bureau noted that the full report of the mission is currently being finalized and that it will be presented to the Committee at its 26th session.
XII.15 The Bureau noted a number of preliminary mission findings and recommendations, in particular that potential threats to the site preceded the current development proposal, the lack of boundary maps and Management ...
Sites: Pirin National Park
XII.19 The Bureau noted that the Minister for the Environment of Slovakia provided a report, dated 30 January 2002, to the Centre that was transmitted to IUCN for review. The report noted that the Minister of Environment, after consultations with the concerned ministries, submitted the proposal to the Slovak Government for designating the Slovak Karst Caves as Slovak Karst National Park, noting that with such a designation the level of protection would increase. The report noted that up to the present, the site has been a Protected Landscape Area where geologic ...
XII.23 Following the report of the joint UNESCO/IUCN Monitoring Mission to the site in 2001, presented to the 25th extraordinary session of the Bureau, and at the request of the 25th session of the Committee, the Permanent Delegation of the Russian Federation transmitted a report on the situation of Lake Baikal dated 1 February 2002.
XII.24 IUCN noted that progress has been achieved in the implementation of a number of measures towards the conservation of Lake Baikal. This was acknowledged in the UNESCO/IUCN report presented to the World Heritage ...
Sites: Lake Baikal
XII.30 Following the request by the 25th session of the Committee, the Permanent Delegation of Russia transmitted a report on the situation of the Volcanoes of Kamchatka, dated 1 February 2002. IUCN noted that the report from the State Party is consistent with IUCN information related to gold mining and the fact that no gas pipeline crosses the territory of the World Heritage site.
XII.31 The State Party reported that salmon poaching in the Kamchatka Peninsula is increasing. However, such activity is being held in check in the protected ...
Sites: Volcanoes of Kamchatka
XII.34 The State Party informed the Centre via letter that its report would only be available after 15 February 2002. The letter notified the Centre of a meeting on 14 February 2002 of the Joint Committee for the Management of Doñana National Park, and the State Party’s intention to provide a report on the state of conservation of the site following this meeting. The full report provided by the State Party noted that the project for the proposed expansion of the Port of Seville had not been approved and that it is subject to expert review by ...
Sites: Doñana National Park
XII.36 A detailed report on the site has been provided via letter and electronic mail from the Department for Culture, Media and Sports dated 11 February 2002. IUCN stated that the report noted that the management plan for the Area of Outstanding Natural Beauty (AONB) which has the World Heritage site as its core, is now under preparation. An issue paper was prepared for public consultation by March 2002, which will be followed by a draft plan in June 2002. A final version of the plan is then to be lodged with the Department of Environment of Northern Ireland (DOENI) in ...
XII.41 A detailed report on the site has been provided via letter and electronic mail from the Department for Culture, Media and Sports dated 4 February 2002. IUCN noted that the report stated that the results from the seabed survey are being analysed and a report will be produced as soon as possible. These results will inform the development of the proposal for an extension to the St Kilda World Heritage site as well as providing information for the site to be designated, and therefore protected under European legislation, as a Special Area of ...
Sites: St Kilda
XII.44 The Bureau was informed that after the illegal fishing incident in October 2001 the State Party has undertaken significant actions to increase the protection of the Marine Reserve. These actions include establishing co-operation with the National Coast Guard Service (NCGS) and the Sea Shepherd Conservation Society for patrolling the marine area, extension of the marine limits up to 12 nautical miles and prosecution of illegal fishing boat owners.
XII.45 IUCN congratulated the State Party on the actions taken to protect the site and on the ...
Sites: Cocos Island National Park
XII.47 The Bureau noted that following the request of the Committee at its 25th session (Helsinki, 2001) the State Party provided a report following completion of a review of the management decisions taken to date to minimise the risks to safety associated with the impending Ruapehu Crater Lake lahar. The Minister of Conservation announced that the installation of a state-of-the-art alarm and warning system, and the construction of a bank alongside the Whangaehu River are sufficient to address risks to public safety from an expected lahar.
XII.48 In ...
Sites: Tongariro National Park
XII.53 The Bureau noted that a report on the state of conservation of the site was provided by the State Party on 30 January 2002 and was reviewed by IUCN and ICOMOS. The Bureau also noted that since 1992 when the Pamukkale Development Plan was issued, a number of positive developments had occurred:
Construction of transportation to the site: the road linking Pamukkale town and the plateau, which climbed through the travertine terraces, has been closed and alternative options are being considered.
New access to the terraces is related to the alternative ...
Sites: Hierapolis-Pamukkale
XII.56 The Bureau was informed that the State Party had submitted, on 6 December 2001, a detailed report stating that almost all the recommendations of the 1999 mission had been followed, including a plan for the village of Aguas Calientes, detailed studies on the carrying capacity of, and the means of access to the Sanctuary and its components, the limitation of visitor facilities in the area surrounding the Ciudadela, and the desirability of extending the site. However, from other reports received through the UNESCO Lima Office, gradual deterioration seems to ...
XII.63 The Bureau, recalling the recommendations of two Seminars, organized by the World Heritage Centre in 1998 and 1999 in collaboration with the Delft University, noted that Byblos is one of five Lebanese sites considered by a large Cultural Heritage and Urban Development Project financed by the World Bank, and examined the summary of the findings of an ICOMOS mission, carried out to the site in November 2001.
XII.64 An Urban Study was commissioned in 2001 by the World Bank to a Lebanese consultant firm, in preparation for the Project. A preliminary ...
Sites: Byblos
XII.78 The Secretariat informed the Bureau on the findings of the mission carried out to the property by a staff of the Centre in November 2001. The property consists of two parts: the Mausoleum mound and, 1.5 kilometers eastward, the Terra Cotta Warriors Museum.
XII.79 The Bureau’s attention was drawn to the insufficient co-ordination of site management authorities, uncontrolled tourism development and the lack of a comprehensive management plan to ensure the conservation and sustainable development of this World Heritage property.
XII.80 The ...
XII.88 The Bureau examined the report on the state of conservation of this World Heritage property presented in document WHC-02/CONF.201/11Rev and the findings of the World Heritage Centre mission undertaken in January 2002 at the invitation of the Government of Iran. The Bureau noted with appreciation, the high level of conservation of the public monuments composing the Historic Centre of Esfahan, including the Meidan Emam World Heritage area.
XII.89 The Bureau, however, expressed concern over the illegally constructed new commercial ...
Sites: Meidan Emam, Esfahan
XII.91 The Bureau examined the report on the state of conservation of this property presented in working document WHC-02/CONF.201/11 Rev.
The Bureau expressed great concern over:
(a) the rapid increase in illegal demolition of historic buildings, including those listed on the inventory of traditional wooden buildings;
(b) the illegal construction of buildings including those of public administrations, in the World Heritage protected area of Luang Prabang, which demonstrates non-respect for the building permit system;
(c) visual impairment and possible ...
Sites: Town of Luang Prabang
XII.94 The Bureau examined the report on the state of conservation of this World Heritage property presented in document WHC-02/CONF.201/11Rev and updated information on the on-going consultations between the Nepalese authorities, the World Heritage Centre, the Advisory Bodies and UNESCO international experts concerning the plans for the conservation of the Maya Devi Temple.
XII.95 The Observer of Nepal informed the Bureau that his Government was considering all recommendations of the Committee, its Bureau, its Advisory Bodies and the UNESCO ...
XII.98 The Secretariat informed the Bureau that the presence of unexploded ordnance (UXO) at the site, following the Vietnam War, has affected the archaeological research of newly-discovered areas, restoration of eight monumental areas, as well as site presentation for visitors. The Bureau noted that the Vietnamese authorities demined unexploded ordnance at four main monuments since 1975. This demining work is progressing slowly, mainly due to lack of funds.
XII.99 The Bureau also noted that, at the request of Vietnamese authorities, the UNESCO ...
Sites: My Son Sanctuary